Due to a planned power outage on Friday, 1/14, between 8am-1pm PST, some services may be impacted.
Excerpts from Corps of Engineers' Upper Des Plaines River flood damage reduction study interim feasibility report and environmental impact statement, June 1999
Excerpts from Corps of Engineers' Upper Des Plaines River flood damage reduction study interim feasibility report and environmental impact statement, June 1999
I. Introduction. -- II. Study area profile. -- III. Problem identification and analysis. --IV. Preliminary formulation of alternative plans. -- V. Formulation of the preliminary Corps plan. -- VI. Recommended plan. -- VII. Real estate requirements. -- VIII. Operation and maintenance requirements. -- IX. Environmental, social and cultural impacts. -- X. Plan implementation. -- XI. Conclusions. -- XII. Recommendations
This Illinois state publication was extracted from the Upper Des Plaines River flood damage reduction study interim feasibility report and environmental impact statement (June 1999) prepared by the Chicago District of the U.S. Army Corps of Engineers (D 103.62: U69/FINAL)
Notes
No copyright page found.
Addeddate
2016-04-20 15:42:53
Associated-names
United States. Army. Corps of Engineers. Chicago District; Illinois. Dept. of Natural Resources
Barcode
30112075787256
Bookplateleaf
0006
Call number
354.3627 E9619x
Camera
Canon EOS 5D Mark II
Copyright_statement
Public domain. Illinois state government document.